Skip to content
Volume Concrete LLC.,

Volume Concrete LLC.,

Concrete, Shotcrete, CDF, Pervious, Grout and Rapid Set® Delivery

  • Home
  • About
    • Policies
    • Ready Mix Concrete Delivery in Oregon
  • Concrete Bin Blocks – New
  • Concrete Calculators
    • Round Column Calculator
    • Slab Calculator
    • Step Calculator
    • Square Column Calculator
  • Concrete Services
  • Concrete Pumps for Hire and Rental
  • Contact
  • Delivery Map
    • Zip Codes
  • Documents – Mix Designs
  • Rapid Set® Concrete Deliveries
    • Rapid Set® Flowable Fill CDF
  • Sewer & Pipe Decommissioning
  • Wet Mix Shotcrete

Concrete Calculators for Slabs, Steps, Round and Square Columns

Choose from the following concrete calculators:

Concrete Slab Calculator
Concrete Step Calculator
Square Column Calculator
Round Column Calculator 

Safety Related Materials

  • MSDS

Concrete Jargon

  • Glossary

Recent Blog Posts

  • FLowable Fill Concrete
  • Concrete Line Pumping in the Pacific Northwest with AAA Concrete Pumping
  • Rapid Set Concrete Pumping into a structural beam for the railroad tracks
  • Protected: Special Operations
  • Concrete Services
  • Pervious Concrete for Paving
  • ASTM 1600 Rapid Hardening Hydraulic Cement
  • Happy Memorial Day Everyone
  • Hot Water Trailer High Capacity Output for Mobile Ready Mix Jobsites
  • Fiberforce 650 1.5″ long
  • Trench Work? Traffic Ready in Hours
  • Controlled Density Fill CDF
  • High Early Strength Concrete HESC
  • Exposed Aggregate Concrete Mix
  • Grouted Brick Prism
  • Mixer 3 is on the Road for Spring
  • The Importance of Choosing Domestic Cement
  • Cold Weather Concrete Success Tips using Accelerators and Water Reducing Admixtures
  • Hot Water Every Load
  • Happy Labor Day 2018

Search

Documents

Mix Designs

Proudly using American Made Portland Cement type I/II produced in Durkee, Oregon

American Made ASH GROVE CEMENT from Durkee, Oregon

WARNING:

Avoid Skin contact with wet concrete, or unhardened cement.  Severe Skin irritation and chemical burns will occur and serious eye damage can occur.  Frequent exposure may and will be associated with allergic contact dermatitis.  Always wear PPE (personal protective equipment) like eyewear, waterproof gloves, long sleeve shirts, and always pants and rubber boots if standing in the concrete.  Always be vigilant about keeping your skin clean from concrete, even the dust and residue after drying will irritate the skin and mucus membranes.  Water is highly recommended for cleanup and needs to be available on all job-sites!

Thanks for Your Business

Driver will need signature for all deliveries inside the curb line before offloading begins.  Signing gives permission for the driver to enter the private property and you acknowledge Volume Concrete LLC., is not liable for any damages.  Please have a qualified and experienced person for backing up the mixer truck onsite.

  • Billing Email
Proudly powered by WordPress