Skip to content

Celebrating America’s 250th Anniversary (1776–2026)

VCVolume ConcreteLLC · Portland Metro

Mix designs / CDF / CLSM

CDF Chute

~100 psi · No air · Line pump or direct discharge

Celebrating America’s 250th Anniversary (1776–2026)

When to use

Barrel-truck controlled-density fill discharged by chute. Designed for 100 psi. Pipe abandonment, trench backfill, and void fill. Excavatable, not structural concrete.

This packet is flowable fill, not foamed cellular concrete. For cellular pipe abandonment — full pipe, annular grout, culvert, or tank — size the volume with the Pipe Abandonment Calculator.

Key specs

  • 100 psi
  • Slump 8 ± 2"
  • w/c 2.47
  • No air
  • 139 pcf
  • 150 lb/cy Type IL — Ash Grove, Durkee, Oregon
  • Barrel truck / chute
  • Estacada plant